02 / Decision state + three paths
Before you add, replace or rebuild.
- Footprint constrained
- Existing asset still useful
- More useful energy needed
MORE AREA
Existing PV + additional footprint
NEW ASSET · SAME FOOTPRINT
Existing asset → replacement asset
RETAIN ASSET · TEST AUGMENTATION
Existing PV + candidate LightEnhancer
Solid grid: existing PVGrey blocks: plantDashed lane: keep clear
Schematic only · no dimensions or installation design · no assumed winner.
Battery and generator / other supply remain credible alternatives.
03 / Intervention → evidence
Test whether it is worth pursuing.
Same asset. Same conditions. Result unknown.
PV ENERGY CHANGE↓ENERGY THE HOST CAN USE↓EFFECT ON THE SYSTEM
YieldCore™
EVIDENCE FOR THE DECISION
PROCEEDREDESIGNSTOP
MODEL / CHECK · FluxForge™
04 / Where it may matter + status
Different assets. The same question.


Operational / remote power
Deployed area, handling or resupply may constrain the system.
Current basis
Public concept, not a released configuration.
Under evaluation
Host fit, burdens and useful-energy value.
Next evidence gate
Controlled comparison + host-system assessment.
PROGRAMME SUPPORT

05 / Qualification, before commitment
Have a constrained solar system?
Let’s establish whether there is something worth testing.
